ZHIEN supplied four ZDC50 industrial high-temperature heat pumps for a chemical factory project in Brazil. The equipment was delivered on 18 July 2024.
Item | Project information |
|---|---|
Location | Brazil |
Facility | Chemical factory |
Equipment | Industrial high-temperature heat pumps |
Model | ZDC50 |
Quantity | 4 units |
Delivery date | 18 July 2024 |
The project photos below show the equipment installation and connected insulated piping and tanks at the factory site.
On-site view of the heat pump equipment and insulated piping.
Another view of the equipment, tanks and pipework at the factory site.
For a new industrial high-temperature heat pump enquiry, share your application, required heating load, water inlet and outlet temperatures, operating hours, site ambient conditions, electrical supply and delivery requirements. Model and quantity should be selected for the actual project duty.