Brazil Chemical Factory High-Temperature Heat Pump Project

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
Reddit sharing button
Threads sharing button
sharethis sharing button

Project Overview

ZHIEN supplied four ZDC50 industrial high-temperature heat pumps for a chemical factory project in Brazil. The equipment was delivered on 18 July 2024.

Project Details

Item

Project information

Location

Brazil

Facility

Chemical factory

Equipment

Industrial high-temperature heat pumps

Model

ZDC50

Quantity

4 units

Delivery date

18 July 2024

On-Site Project Photos

The project photos below show the equipment installation and connected insulated piping and tanks at the factory site.

ZDC50 industrial high-temperature heat pump installation at a chemical factory in Brazil

On-site view of the heat pump equipment and insulated piping.

Insulated piping and tanks at the Brazil chemical factory high-temperature heat pump project

Another view of the equipment, tanks and pipework at the factory site.

Discuss Your Industrial Heating Project

For a new industrial high-temperature heat pump enquiry, share your application, required heating load, water inlet and outlet temperatures, operating hours, site ambient conditions, electrical supply and delivery requirements. Model and quantity should be selected for the actual project duty.

Explore ZHIEN OEM/ODM and project support or contact our team to discuss an industrial heat pump project.

Telephone
+86 13456307001
WhatsApp
+86 13067536905
Email: sales@zhien-newenery.com
 

Quick Links

Product Categories

Get in Touch With Us

Subscribe to Our Newsletter

​Copyright © 2026 Zhejiang Zhien New Energy Co., Ltd. All Rights Reserved.