ZHIEN supplied 12 ZDC70 heat pump units for a hospital project in São Paulo, Brazil. The project was delivered on 19 March 2022.
Location | São Paulo, Brazil |
|---|---|
Project Type | Hospital |
Equipment Model | ZDC70 |
Quantity | 12 units |
Delivery Date | 19 March 2022 |
The site photos below show the installed heat pump units and associated piping at the hospital project.
São Paulo hospital project — installed units and piping.
On-site view of the ZDC70 heat pump units.
This São Paulo reference project used 12 ZDC70 units. A new hospital project requires separate equipment selection based on its intended duty and operating conditions; the installed quantity in this case is not a sizing rule.
Share the following information for project selection:
Required application: hot water, space heating or cooling.
Design load, peak demand and operating schedule.
Required inlet and outlet water temperatures, water flow and system arrangement.
Installation country, site ambient conditions and power supply voltage, phase and frequency.
Redundancy requirements, delivery schedule and required project documentation.
Compare current commercial heat pump models or review our OEM/ODM and project support. Current catalogue models should be selected for the new project's requirements rather than assumed to match the ZDC70 equipment in this case.