For a commercial pool cooling project, the first step is to define the cooling duty and the site conditions. A catalogue heating capacity is not enough to select a cooling unit. This guide sets out the information ZHIEN requests for projects in the UAE, Saudi Arabia and other export markets.
ZHIEN pool heat pumps are supplied in either a heating or a cooling configuration selected for the order. A single unit does not include both functions. State the required duty at the start of the enquiry so the quotation and datasheet describe the correct configuration.
For example, the ZY-110/SN1-DP listing shows 110 kW heating capacity at outdoor dry/wet bulb 20/15°C and water inlet/outlet 15/32°C. This is a heating rating, not a promise of 110 kW cooling. Request confirmed cooling capacity and power input at the project's required conditions.
Information to provide | Details for the enquiry |
|---|---|
Pool and application | Hotel, leisure facility or other use; indoor or outdoor pool; dimensions, water volume and surface area. |
Water temperatures | Target pool temperature and design inlet/outlet temperatures for the cooling equipment. |
Operating requirement | Operating season and daily hours; whether the duty is temperature maintenance or initial pull-down within a specified time. |
Ambient and location | Project city, design ambient conditions, installation position and any airflow or space constraints. |
Water circuit | Available circulation flow, water quality information and the proposed system arrangement. |
Electrical supply | Voltage, phase and frequency required at the actual installation. |
Procurement | Required quantity, delivery date, documentation and any order-specific options. |
Identify any assumptions that are still provisional. A quotation based on provisional ambient or water temperatures should be reviewed when the project design is confirmed.
Compare the exact model and configuration, rated cooling capacity, electrical input, design ambient and water conditions, and required water flow. Ask the supplier to identify the conditions associated with every quoted capacity. A heating COP or a heating-mode maximum outlet temperature does not establish cooling performance.
Confirm the electrical version separately. Our published ZY-110/SN1-DP and ZY-220/SN1-DP heating listings describe 380V/50Hz equipment. A 60Hz requirement needs a confirmed configuration and its own performance data; do not assume the 50Hz figures apply unchanged.
Provide the proposed location, circulation arrangement and installation constraints for review against the selected configuration's requirements. Pool water volume alone does not determine model size or unit quantity. Include the target operating duty, site conditions, recovery or pull-down time and any redundancy requirement.
ZHIEN supplied 24 ZDC180 heat pumps for a large commercial swimming pool project in Dubai, delivered on 9 July 2020. View the Dubai project facts and installation photo. This reference records a different model; it does not establish the cooling capacity or quantity needed for a new pool.
Explore our commercial swimming pool heat pump range and OEM/ODM and project support. Send the requirement sheet through our project enquiry page so our team can review the required configuration and prepare a quotation.